    This stator line is mainly suitable for the production of EV motor stators; the whole line is highly automatic and adopts advanced design schemes. The whole line integrates slot insulation paper inserting, laser marking, coil winding and inserting, pre-forming, phase paper inserting, Star spot welding, middle forming, double-sided lacing, final forming, terminal welding, stator testing, NG rework, stator unloading functions.
    This flexible production line is a new stator production line, which is intellectualized, automatic and informational in one. It features time changing time for whole line within 2 hours.

  • Basic Specification

    Basic Specification:
    -Stator O.D.: Φ150mm-Φ250mm
    -Stator I.D.: Φ90mm-Φ190mm
    -Stator Stack Length: 60mm-160mm
    -Slot Number: 36-72
    -Slot opening width:≥1.6mm

  • Production Process

    Manually load the stator core to paper inserting machine via cantilever
    Manually load the stator coil to pallet after inserting
    Print QR code on stator terminal end/arc side
    Insert wire coil into stator core
    Manually sort wires from third phase
    Manually sort wires from third phase and install tubes
    Pre-forming for terminal ends
    Manually insert the phase insulation paper
    Manually sort wires
    Insert copper tube and weld with star-point
    Automatic middle-forming
    Automatic double-sides lacing
    Automatic final-forming
    Automatic slot end paper expanding
    Manually sort and cut wires, install terminals, cut pre-lacing Nylon type; Automatic weld terminals
    Manually stator eye testing and then loose pallet clamping block
    Test for stator voltage, phase sequence, resistance, and etc.

    Stator core delivery
    Front stator double-speed flow Chain
    Back stator double-speed flow Chain

  • Technical Proposal

    Cycle time: ≤170 sec/pc
    Tooling changing time for whole line within 2 hours (needs workers within 10 persons)
    Equipped with MES to realize production process traceability and electric boards for whole production lines and equipped working stations.
    100% for reliability of testing system and online inspection rate for key parameter